PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Lifting Slip forms at Elev. 5,6 to 3rd floor Facing South (800x600).jpg Lifting Slip forms at Elev. 1,2,3 to 3rd floor Facing South (800x600).jpg Lifting the slip forms at Elev. 4,5 3rd floor Facing South-East (800x600).jpg Lifting the slip forms at Elev. 4-Stair -2 3rd floor Facing South (800x600).jpg Stripped foundation walls at Elev. 7-Stair 4,5 Facing South (800x600).jpg Stripped foundation walls at Elev. 7-Stair 4,5 Facing South-East (800x600).jpg Stripping the foundation wall forms at Elev. 7-Stair 4,5 Facing North(800x600).jpg Stripping the foundation wall forms at Elev. 7-Stair 4,5 Facing South-East(800x600).jpg Stripping the foundation wall forms at Elev. 7-Stair 4,5 Facing West(800x600).jpg
Previous pageNext page Stripped foundation walls at Elev. 7-Stair 4,5 Facing South (800x600)
Stripped foundation walls at Elev. 7-Stair 4,5 Facing South (800x600)